Sand Calculator
The bedding sand layer your pavers sit on, by the ton and bag.
Calculate sandHardscaping calculator
Enter the size of your patio or path and the paver you're using. You'll get exactly how many pavers to buy, including extra for cuts and breakage. Covering more than one area? Add a row for each.
Measure the length and width of the area you're paving and pick your paver size from the presets, or enter a custom size. You'll get the number of pavers, the area covered, and how many pavers per square foot. Paving a patio and a path? Add a row for each and they're totaled together.
Two optional fields do real work here. Joint gap is the spacing you'll leave between pavers — leave it blank for tight-laid pavers. Waste allowance starts blank, which means no waste is added unless you enter a number. Don't skip it. On this calculator, more than any other on the site, the waste figure is the difference between finishing your patio and stopping two rows short.
Pavers are a counting problem, not a volume one — there's no depth, no density, and no cubic yards. You're dividing one area by another:
Paver area (sq ft) = (Length in ÷ 12) × (Width in ÷ 12)
Pavers = Total area (sq ft) ÷ Paver area (sq ft)
Then multiply by your waste allowance and round up.
Rounding always goes up, because you cannot buy 0.4 of a paver. If you enter a joint gap, the calculator adds it to both dimensions first, since each paver effectively occupies its own size plus half a joint on every side.
This deserves its own section because it's where paver projects go wrong. Every cut paver produces an offcut, and most offcuts are unusable. A 5% allowance is fine for a plain rectangle laid in running bond. Turn that same patio 45 degrees, or curve one edge, and your cuts multiply — every single paver along the perimeter needs cutting, and each cut wastes most of a paver.
| Layout | Add | Why |
|---|---|---|
| Running bond or stack bond, square area | 5% | Cuts only along two edges, mostly reusable |
| Running bond with obstacles (posts, beds) | 8–10% | Extra cuts around each obstruction |
| 45° diagonal or herringbone | 10–15% | Every perimeter paver is a cut; offcuts are triangles |
| Circular, curved, or radial edges | 15–20% | Every edge paver is a bespoke cut |
| Multi-size or multi-colour patterns | 10%+ | You'll run short on one component before the others |
What that means on our 144 sq ft patio, which needs 384 pavers before waste:
| Layout | Waste | Order | Extra pavers |
|---|---|---|---|
| Running bond, square | 5% | 404 | +20 |
| Running bond, some cuts | 8% | 415 | +31 |
| 45° herringbone | 12% | 431 | +47 |
| Circular / curved edge | 18% | 454 | +70 |
The gap between 5% and 18% is 50 pavers. Guessing wrong in the cautious direction costs you a few dollars of leftovers that make excellent spare repairs. Guessing wrong in the other direction means a second trip, and quite possibly a different production batch in a visibly different shade. Our guide on how many pavers you need goes further into pattern planning.
Useful for sanity-checking a supplier's quote, or converting between a pallet count and an area.
| Paver size | Area each | Pavers per sq ft |
|---|---|---|
| 4 × 8 in (brick) | 0.22 sq ft | 4.50 |
| 6 × 6 in | 0.25 sq ft | 4.00 |
| 6 × 9 in | 0.38 sq ft | 2.67 |
| 8 × 8 in | 0.44 sq ft | 2.25 |
| 12 × 12 in | 1.00 sq ft | 1.00 |
| 16 × 16 in | 1.78 sq ft | 0.56 |
| 12 × 18 in | 1.50 sq ft | 0.67 |
| 12 × 24 in | 2.00 sq ft | 0.50 |
Counts below are before any waste allowance — add yours from the table above.
| Patio | Area | 4 × 8 in | 6 × 9 in | 12 × 12 in |
|---|---|---|---|---|
| 8 × 10 ft | 80 sq ft | 360 | 214 | 80 |
| 10 × 10 ft | 100 sq ft | 450 | 267 | 100 |
| 10 × 12 ft | 120 sq ft | 540 | 320 | 120 |
| 12 × 12 ft | 144 sq ft | 648 | 384 | 144 |
| 12 × 16 ft | 192 sq ft | 864 | 512 | 192 |
| 12 × 20 ft | 240 sq ft | 1,080 | 640 | 240 |
| 16 × 20 ft | 320 sq ft | 1,440 | 854 | 320 |
Most concrete pavers are laid tight, with the joint formed by the small chamfer on each edge — in that case leave the gap blank. If you're deliberately spacing them, the gap reduces your paver count, because each one covers more ground:
| Joint gap | Effective size | Pavers per sq ft | Needed for 144 sq ft |
|---|---|---|---|
| None (tight-laid) | 0.375 sq ft | 2.67 | 384 |
| ⅛ in | 0.388 sq ft | 2.58 | 372 |
| ¼ in | 0.402 sq ft | 2.49 | 359 |
| ⅜ in | 0.415 sq ft | 2.41 | 347 |
A quarter-inch gap saves 25 pavers on a small patio — but only enter a gap you're actually going to lay. Assuming a gap you don't leave is how you finish 25 pavers short.
The pavers are the last layer and the smallest part of the work. Under every lasting patio there are three more:
You also need edge restraints around the perimeter. Without them the outer pavers creep outward every year, the joints open, and the whole field loosens from the edge inward.
Pavers are usually priced per square foot rather than per unit, which is another reason to know your area as well as your count.
| Layer | Quantity | Cost |
|---|---|---|
| Pavers (404 at 6 × 9 in) | 144 sq ft | $288–$864 |
| Gravel base, 4 in | 1.78 cu yd / 2.49 tons | $50–$112 |
| Bedding sand, 1 in | 0.44 cu yd / 0.60 tons | $15–$24 |
| Polymeric jointing sand | 2–3 bags | $50–$120 |
| Materials total | roughly $400–$1,120 |
Add delivery on the gravel and sand, plus edge restraints and spikes. Professional installation typically runs $10–$25 per square foot all-in, which puts the same patio somewhere around $1,400–$3,600 — so the base and bedding you'd rather not think about are most of what you're paying for.
This calculator gives you a clean count from your measurements and paver size. Real jobs vary with actual paver dimensions, how tightly you lay them, and how many cuts your pattern demands, so treat the result as a close planning number and round up. Pavers are usually sold by the pallet or layer, so your supplier will round up again — ask what a full pallet holds before you finalise the order.
A 12 ft by 12 ft patio is 144 square feet. With 6 × 9 in pavers that's 384 pavers before waste, or about 404 with a 5% allowance. With 12 × 12 in pavers it's 144, and with 4 × 8 in brick pavers it's 648.
It depends entirely on size. A 4 × 8 in brick paver covers 0.22 sq ft, so you need 4.5 per square foot. A 6 × 9 in paver needs 2.67, an 8 × 8 in needs 2.25, and a 12 × 12 in paver is exactly 1 per square foot.
Five percent for a plain rectangle in running bond. Eight to ten percent if you're cutting around posts or beds, 10–15% for a 45° diagonal or herringbone pattern, and 15–20% for circular or curved edges. Note the calculator adds nothing unless you enter a number.
Because every paver around the perimeter has to be cut at an angle, and the offcuts are triangles you usually can't reuse. On a 144 sq ft patio, going from a square running bond at 5% to a 45° herringbone at 12% takes the order from 404 pavers to 431.
Only if you're actually going to leave one. Most concrete pavers are laid tight, with the joint formed by the chamfered edges, so the gap should be blank. If you do space them, a quarter-inch gap on a 144 sq ft patio drops the count from 384 to 359 — but assuming a gap you don't lay leaves you 25 pavers short.
Four layers: compacted subgrade, 4–6 inches of compacted gravel base, 1 inch of screeded bedding sand, then the pavers, with polymeric sand swept into the joints afterwards. The gravel carries the load; the sand only levels. You also need edge restraints around the perimeter.
For a 12 × 12 ft patio, materials run roughly $400–$1,120: $288–$864 for concrete pavers, $50–$112 of gravel base, $15–$24 of bedding sand, and $50–$120 of polymeric sand, plus delivery and edge restraints. Professional installation typically runs $10–$25 per square foot, or about $1,400–$3,600 for the same patio.
Yes. Concrete pavers vary in shade between production batches, and a top-up order months later can arrive visibly different. Order the whole job from one batch, blend from several pallets as you lay, and keep about ten spares from that batch for future repairs.
Keep planning
The bedding sand layer your pavers sit on, by the ton and bag.
Calculate sandThe compacted gravel base beneath the sand, in tons and yards.
Calculate gravelThe full build order, depths, and the right sand to use.
Read the guide